A fixed-fee, one-day engineering audit of the irrigation, fertigation and climate control in a running SAHPRA-licensed cannabis facility. You get a scored report, a costed retrofit plan in phases, and the full audit fee back off the install if you go ahead.
01 · Who it is for
Licence holders running rooms that work, but not well enough.
Hand-mixed batch tanks, drifting runoff EC, uneven dry-backs between tables, a pump that cycles, a controller nobody fully trusts. The audit puts numbers on each of these before anything is bought.
02 · How the audit runs
Six steps, one fixed fee.
Book and intake
Day −7You send a short intake: room list and canopy area, water source and any lab report, current feed recipe, controller and pump models, photos of the water room. We send a water sample bottle with instructions.
Site walk
Day 0, morningWalk the water train end to end with your head grower. Mark the eight test points on the plan. Note every brand, model and pipe size against what is actually installed.
Measure and test
Day 0, middayPressure and flow at each zone, catch-can uniformity test on a sample of tables, dosing accuracy on each injector, input and runoff EC and pH, alkalinity titration, pump cycling, a 24-hour climate log pull.
Lab and analysis
Days 1 to 5Full water analysis at an accredited SA lab. We work out the acid dose, the RO decision, the pump duty point against its curve and the zone hydraulics.
Report and retrofit plan
Day 7Scored report per system (green, amber, red), the cause of each fault, and a retrofit plan in three phases with a fixed price per phase. Brands named, part by part.
Walk-through and credit
Day 7 to 10A one-hour walk-through with you and your grower. Sign any phase within 60 days and the full audit fee comes off that invoice.
03 · Where we measure
Eight test points, source to runoff.
04 · Audit checklist
What we check, system by system.
Water
- Source EC, pH, alkalinity (mg/L CaCO₃), Ca, Mg, Na, Cl, Fe, B
- Bicarbonate load and acid dose to reach target pH
- RO need, permeate quality, recovery and reject volume
- Backflow protection to the municipal supply
- Tank material, cover, stirring and temperature
Basis: SANS 241 drinking water, SANS 10252-1 supply installations, National Water Act for borehole use.
Dosatron and injectors
- Injection ratio measured against the dial setting
- Seals, check valves and wear on each injector
- Stock tank concentration and mixing order (no Ca with SO₄ or PO₄ in one stock)
- Feed EC and pH at the dripper against the recipe
- Hand-mix steps that can be automated
Target: delivered EC within ±5% of recipe, pH within ±0.2.
DAB pump set
- Duty point (flow and head) against the pump curve
- Pressure at the pump, after the filter and at the far zone
- Start and stop cycling, pressure tank pre-charge
- Suction set-up, NPSH margin, priming
- Motor current against nameplate
Target: duty point in the pump's best efficiency band, under 10 starts per hour.
Netafim and Rain Bird
- Catch-can test: distribution uniformity per zone
- Emitter type, flow and pressure-compensation range
- Filter mesh, Δp and flush routine
- Valve sizing, solenoid response, manifold layout
- Shot size, dry-back and runoff % by table
Target: DU of 90% or more on pressure-compensating drip.
TrolMaster and sensors
- Irrigation timers and shot schedule against the crop steering plan
- Sensor calibration: EC, pH, substrate moisture, temperature, RH
- Day and night VPD from 24 h of logs
- Alarms, fail-safes and load-shedding recovery
- HVAC and power findings passed to our Climate & Power partners
Target: VPD 0.8 to 1.2 kPa in veg, 1.0 to 1.5 kPa in flower.
Compliance
- Dosing logs, calibration records and feed SOPs
- Batch records that tie a feed to a harvest lot
- Acid and nutrient storage, PPE and spill kit
- Labelled valves and a current P&ID
- Gaps against what a SAHPRA inspector will ask for
Basis: SAHPRA Section 22C licence conditions, GACP practice, OHS Act hazardous chemical rules.
05 · The engineering behind it
Every finding comes with the number behind it.
DUlq = q̄low ¼ ÷ q̄
Mean flow of the lowest quarter of catch cans over the mean of all. A DU of 80% means the driest plants get a fifth less water and feed than average, so the room is steered to its worst table.
HCO₃⁻ + H⁺ → H₂O + CO₂
Each mmol of bicarbonate takes one mmol of acid. The titration sets the nitric or phosphoric acid dose, and shows whether RO pays for itself.
P = ρ g Q H ÷ η
Hydraulic power from flow Q and head H. A pump far off its best efficiency point burns power and wears seals; we plot where yours actually runs.
q = k · Px
Pressure-compensating drippers have an exponent near zero inside their range. Outside it they behave like plain orifices (x ≈ 0.5), and uniformity drops with pipe friction.
VPD = es(T) · (1 − RH)
With es = 0.6108 · exp(17.27 T ÷ (T + 237.3)) kPa. Logged leaf-zone VPD tells us whether irrigation faults are really climate faults.
ratio = Vstock ÷ Vwater
A Dosatron at 1:100 should inject 1% by volume. We measure the drawn stock against a metered volume of water; a worn seal often runs 10 to 20% lean.
06 · What you get
A report you can act on the same week.
Scored audit report
Green, amber or red per system, with the measured value, the target and the cause for each finding.
Water chemistry sheet
Lab results, acid dose per 1,000 L, and the RO decision with its water and power cost.
Hydraulics sheet
Pump duty point on its curve, zone pressures, DU per zone and the pipe or valve change that fixes each low one.
As-built and proposed schematic
A P&ID of the system you have and the system we propose, with each change numbered.
Phased retrofit plan
Three phases (fix, automate, scale), each with a fixed price and a named-brand bill of materials from Dosatron, DAB, Netafim, Rain Bird and TrolMaster.
Compliance gap list
Missing logs, SOPs and labels, with templates for the dosing and calibration records.
Sample scorecard page
| System | Measured | Target | Score | Retrofit phase |
|---|---|---|---|---|
| Source alkalinity | 180 mg/L CaCO₃ | under 100 mg/L, or acid-dosed | Amber | 1 · add acid line |
| Dosatron 1:100, part A | 0.83% injected | 1.00% ±5% | Red | 1 · seal kit, recalibrate |
| Zone 3 uniformity | DU 78% | 90% or more | Red | 1 · PC drippers, loop the header |
| Pump starts | 22 per hour | under 10 per hour | Amber | 2 · DAB Esybox, pressure tank |
| Flower room VPD, night | 0.6 kPa | 1.0 to 1.5 kPa | Amber | Climate & Power partner |
| Dosing and calibration logs | kept on paper, gaps | daily, signed | Green | 3 · TrolMaster logging |
Example values for illustration only. They are not from a client site.
07 · Fee
Fixed fee, credited in full on the install.
R 6 500excl. VAT
One room or one water train, up to 150 m² canopy.
- Half day on site
- Test points T1 to T8 on one train
- Lab water analysis
- Scorecard and phase 1 fix list
R 14 500excl. VAT
Up to four rooms and one water room, up to 600 m² canopy. The standard offer.
- Full day on site
- All checklist sections
- Lab analysis, hydraulics and schematic
- Three-phase retrofit plan with fixed prices
- Compliance gap list and log templates
R 24 000from, excl. VAT
Over 600 m² canopy, more than one water room, or more than one site.
- Two days on site
- Everything in Option B
- Climate and power review with our partners
- Capex plan across sites
How the credit works (Option B example)
- Fees are fixed launch prices and exclude VAT. Travel within 100 km of Cape Town is included; further afield is charged at the AA rate per km.
- Paid in full on booking. The credit applies to the first retrofit or turnkey invoice signed within 60 days of the report.
- Lab fees are included. Climate and power findings are passed to our partners and quoted by them separately.
- The report is yours. You can use it to buy from anyone; the credit only applies when Demetron installs.
08 · Brands and partner
Trusted brands, supplied locally.
Demetron designs and installs. Equipment comes through our partner Hydrobiz in Cape Town, agents for the brands below, so spares and warranty stay in the Western Cape.
Book an audit
One day on site. A plan you can price.
Send your room count, canopy area and water source, and we will confirm a date within two working days. Western Cape first, then Gauteng and KZN.